Interior Fit-Out Services in Dubai

You have the keys to a bare apartment, a new villa or an empty office. We plan and build the finished space around the way you will use it.

We look after the design, the building approvals and the work on site, and keep you updated at every stage.

What Our Fit-Out Services Include

Site survey

We visit the space and record the condition it was handed over in. An office at shell and core needs far more work than one at Cat A. An apartment with no finishes needs more than one the developer has finished. This sets the scope and the timeline.

Design and drawings

We prepare the layout, ceiling, lighting and finishes drawings together, so each one works with the others. The approvals and the site team both work from these drawings.

Approvals

Most fit-outs need a No Objection Certificate from the developer or building management, and authority approval before work starts. Commercial spaces also need Dubai Civil Defence sign-off. We prepare the drawings and handle the submissions.

Partitions

New walls that set the layout. Glass partitions are used in offices so daylight reaches the inner rooms.

Ceilings

False ceilings that hide the air conditioning ducts and carry the lighting. Cove and coffered details are added where the design calls for them.

MEP Services

Air conditioning, electrical and plumbing. We move ducts and diffusers to suit the new layout and add new circuits and power points. We also run plumbing to new kitchens, bathrooms and pantries.

Flooring & Wall Finishes

Porcelain, marble, natural stone or engineered timber, laid level across the whole space. For walls: Paint, fluted timber panelling, stone cladding and feature walls.

Joinery

Wardrobes, kitchens, vanity units, media walls and reception desks, made to measure for the space.

Lighting & Fire Safety

Cove, task and feature lighting, planned room by room. In commercial units, sprinklers, smoke detectors and emergency lighting are adjusted to the new layout.

Handover

A final walk-through with you, a snag list and a full clean before the keys come back to you.

How Much Work Your Space Needs

The work depends on the condition your space was handed over in. We check this at the site visit and tell you what it means for the scope.

Shell and Core

Offices, Shops & Restaurants

The unit has its outer walls, a concrete floor and the building’s main services at the door. Nothing inside is built yet. We build everything, including the floor, the ceiling, the air conditioning and the power. Shops and restaurants are usually handed over this way.

Cat A / Cat B

Offices

The landlord has already fitted a raised floor, a ceiling, basic lighting, air conditioning and fire detection. There are no rooms yet. We build the partitions, meeting rooms, pantry and finishes your business needs (Cat B). New partitions usually need fresh approvals.

Bare Apartment or Villa

You receive the walls, a levelled floor base and the service points. We design and build the full interior.

Developer-Finished

Apartments & Villas

The kitchen, wardrobes and bathrooms are already in place. We help you decide what to keep and what to replace, and we can price both options for you.

Fit-Out for Homes and Commercial Spaces

We take on both residential and commercial projects. Where a business stays open during the work, we schedule the noisy trades outside trading hours. At the site visit we tell you what your building, community or landlord will allow.

Homes

Apartments

The building’s fixed services shape the layout. Shared drainage pipes, floor levels, and AC bulkheads mostly stay where they are, so the design works around them. Changes need an NOC from the developer or building management. Working hours and deliveries are set by building management.

Villas

You have more room to change things. Kitchens and bathrooms can usually be moved, and the layout can extend into outdoor space. Community rules and approvals still apply.

Living Through the Work

If you are living in the home, we work room by room. We keep dust out of the rest of the house and plan the work so that a kitchen and a bathroom stay usable. An empty home lets all the trades work at the same time and finishes sooner.

Commercial Spaces

Offices

The landlord’s fit-out guidelines set what can be fixed to the structure, how new services connect to the building and when noisy work is allowed. We read these before we draw the layout.

Restaurants

The kitchen layout has to meet food safety requirements. The grease extraction has to be designed and routed to a point the building accepts. In a mall, much of the work happens at night when the centre is closed.

Shops

The opening date is usually fixed early, so the work is planned back from that date. Mall operators also set their own design and working rules.

How a Nexspace Fit-Out Works

01

Consultation

We talk through the space, how you plan to use it and your budget.

02

Site Survey

We visit, measure and record the condition the space was handed over in. If you have the handover drawings, we check them against the site.

03

Design & Materials

We prepare layout, ceiling, lighting, and finishes drawings with visuals. You choose materials from real samples. This usually takes more than one meeting.

04

Quotation

You receive a quotation that lists the scope item by item, based on the agreed drawings.

05

Approvals

We prepare and submit the NOC and authority paperwork. Commercial spaces also go to Civil Defence. Work on site starts only after approvals are in place.

06

Site Work & Joinery

Joinery is made while site work goes ahead. Partitions, services, and ceilings go in first, then floors and finishes, and joinery is installed last.

07

Testing & Handover

We test the AC, lighting and power, and work through a snag list with you. The space is cleaned and handed over ready to use.

Approvals for Your Fit-Out

Every building and community has its own approval process. We prepare the drawings and handle the submissions, and you sign only what is needed as the owner or tenant.

Why Clients Choose Nexspace

Our approvals team prepares and submits the No Objection Certificate and the authority applications. This work is part of your quotation from the start.

We fit out apartments, villas, offices, restaurants and shops. The same team plans the design, the approvals and the work on site.

Wardrobes, kitchens, panelling and reception desks are built to your drawings and installed by our own team.

You have one project manager from the site survey to handover, who keeps you updated at each stage.

Reviews

After Handover

Every building and community has its own approval process. We prepare the drawings and handle the submissions, and you sign only what is needed as the owner or tenant.

Where We Work

We take fit-out projects across Dubai and the wider UAE. We have worked in Palm Jumeirah, Dubai Marina, Downtown Dubai, Damac Hills and The Fields.

Start With a Site Visit

Tell us about your space: whether it is a home, an office, a restaurant or a shop, and the condition it was handed over in. Send a few photographs or the handover drawings if you have them. We will arrange a site visit and tell you beforehand what it will cover..